| ARC '08 Update |
|
|
|
|
Lotsa of "stuff" happening on and in ARC'08
The fascia is on the outside of the house. What's fascia? Check it out http://www.en.wikipedia.org/wiki/Fascia_(architecture)
The wood under the back eave is up, and looks great.
The sheetrock is hung, taped and sanded.
The walls are getting wainscotting.
Mark has made wood doors with polycarb inserts. "Twin wall" polycarb is being used in ARC '08, because of the insulation value. What is polycarb? Check it out http://www.en.wikipedia.org/wiki/Polycarb
The large garage area is designed for water storage tanks, the polycarb panels in the garage will provide light for greenhouse use.
The window seat in the bedroom is taking shape.
Heading upstairs, more wood has gone up.
A interesting view from the upstairs window...
There will be a varity of wood throughout ARC'08 inclucing pine, aspen, cedar and cherry.
This wall is waiting for polycarb inserts, allowing more light into the upstairs area.
The second set of windows is set in place upstairs. And the work continues... with discussions on water reprocessing, compact solar panels, trimwork, wall colors and finishes all happening at the same time!
|














