logo
 
Continuing Activity in Old Main PDF Print E-mail
User Rating: / 0
PoorBest 
Written by Stef Bristow   
Sunday, 09 March 2008 15:28

A lot has changed in Old Main since my last entry.  The cob bathroom continues to take shape with the completed vanity and a closet.

Image

Erika has been researching designs and sealants for the cob bathtub.  The bowl has been coated with Aqua Art, which will protect the interior of the bowl and eventually the cob bathtub from moisture damage.  

Image 

 Happy Dancing Turtle has a space it can call home.  What once served as the shop in Old Main is now office space for Nolita, Barb and Quinn.  

Image

 Quinn is finishing up the cob wall in the upstairs office.  Once she is done with the wall and window arches flooring will be installed and Donna, Ellen and Kathy will be setting up their work spaces. 

Image

The wooden staircase has taken a turn - literally. In its temporary state the stairs descended straight down. Now, however the bottom section of stairs face the interior of the main room, giving visitors coming in the north entrance a clear view of where they can gain access to the second floor.

Image 

Last Updated on Monday, 10 March 2008 01:36